Long story short - the power company that supplies power to the THR system and others decided to change the power pole during the day. They thought they could do it without power interruption - they were wrong. The THR server went down without a clean shutdown. Derek, the sysop, got in there and had to mop up all the data that spilled out onto the floor and put it back in the right place. Looks like he got it right.